Monday, July 28, 2014

Save Water .... recharge the aquifers

http://t.co/TY6mNe0Tap



Depleting ground water levels cause of worry

Vishwa Mohan,TNN | Jul 27, 2014, 04.24AM IST
The CGWB, a government agency, came to this conclusion by analyzing 10,219 wells across the country.
Text resize:

NEW DELHI: Ground water levels in various parts of India are declining as the country could not adequately recharge aquifers in deficit areas where it has been used for irrigation, industries and drinking water needs of the growing population over the years.

The Central Ground Water Board (CGWB) has told the ministry of water resources that around 56% of the wells, which are analyzed to keep a tab on ground water level, showed decline in its level in 2013 as compared to the average of preceding 10 years (2003-12) period.

The CGWB, a government agency, came to this conclusion by analyzing 10,219 wells across the country. It found that 5,699 wells had reported decline during that period. It also concluded that agriculture sector is the biggest user of water followed by domestic and industrial sector.

Sharing the Board's data, the ministry of water resources had last week told the Lok Sabha that the ground water was continuously being exploited due to growth in population, increased industrialization and irrigation.

"As a result, ground water levels in various parts of the country are declining... The state governments have been advised to take suitable remedial measures to check ground water exploitation and ensure recharge of aquifers in water stressed areas", said the minister of state for water resources, Santosh Gangwar, in his written response to a question.

Depleting ground water level may be a real worry if one looks at the future demand of water in India. It is estimated that the country would need 1,180 billion cubic meter (BCM) of water annually by 2050. India has, at present, annual potential of 1,123 BCM of 'utilizable' water with 690 BCM coming from surface water resources and remaining 433 BCM from ground water resources.




In view of this projection, the country would not be able to meet its future demand unless it recharges its aquifers adequately and uses water more efficiently and judiciously.

The government has already decided to set up a National Bureau of Water Use Efficiency (NBWUE) under its 'National Water Mission' to promote water conservation in a big way, keeping in mind the future requirement.

The CGWB has, on its part, recently signed a memorandum of understanding (MoU) with Indian Institute of Remote Sensing to facilitate a collaborative study "to assess the impact of ground water abstraction" in India. The study will be first of its kind in the country and will have great significance in identification of hotspots affected by over exploitation of ground water.....................http://epaperbeta.timesofindia.com/Article.aspx?eid=31804&articlexml=Depleting-ground-water-levels-in-country-cause-of-27072014015025#

MyGov - portal to crowd source ideas and work as a public audit platform

http://t.co/AFj46nzvCO


PM launches unique web platform to get citizens' ideas for governance

Vishwa Mohan,TNN | Jul 26, 2014, 02.04PM IST
The platform will allow flow of ideas\suggestions on various issues including Modi's pet project of cleaning the river Ganga, education of girl child and job creation.
Text resize:

NEW DELHI: Prime Minister Narendra Modi on Saturday launched a web platform - MyGov - which will allow common man and experts from different fields to reach out to the government with their ideas a nd suggestions.
The web platform - www.mygov.nic.in- is devised in such a way that it allows the citizens to discuss their ideas with experts within and outside the government and even earn "credit points" for the tasks which would eventually be approved for implementation by concerned departments\agencies.
The platform will allow flow of ideas\suggestions on various issues including Modi's pet project of cleaning the river Ganga, education of girl child and job creation.
" The objective of each group is to bring about a qualitative change in that sphere through people's participation", said Modi after launching this ambitious web interface of his government.
Stating that in the past, there used to be a big gap between the people and the processes of governance, the Prime Minister said that in the past sixty days, the experience of his government was that there were many people who wanted to contribute towards nation-building, and devote their time and energy.
"The only thing they required was an opportunity to shine and showcase their contribution. The MyGov platform is a technology-driven medium that would provide this opportunity to contribute towards good governance"", he said.


Official note of the PMO explains that the web platform presents an opportunity to the citizens to both 'Discuss' and 'Do'. There are multiple theme-based discussions on MyGov where a wide range of people would share their thoughts and ideas.
Further, any idea shared by a contributor will also be discussed on these discussion forums, allowing constructive feedback and interaction. For those who wish to go beyond discussions and wish to contribute on the ground, the MyGov offers several avenues to do so. Citizens can volunteer for various tasks and submit their entries.
"These tasks would then be reviewed by other members and experts. Once approved, these tasks can be shared by those who complete the task and by other members on MyGov. Every approved task would earn credit points for completing the task", said the PMO statement.
The National Informatics Centre (NIC), Department of Electronics and Information Technology (DeitY) would implement and manage the platform "MyGov" which would facilitate Citizen Engagement in Good Governance.
Speaking on the occasion of the launch of MyGov, which also marked the completion of sixty days of the new government, the Prime Minister said, "The success of democracy is impossible without participation of the people".
He expressed confidence that the people would welcome this initiative and invited suggestions to strengthen and improve the platform.
The platform has been divided into various groups namely Clean Ganga, Girl Child Education, Clean India, Skilled India, Digital India, Job Creation. Each group consists of online and on-ground tasks that can be taken up by the contributors. The objective of each group is to bring about a qualitative change in that sphere through people's participation
The minister for communication and IT, law and justice, Shri Ravi Shankar Prasad, and senior officers of the government of India were present at the launch of the platform.

"The inauguration of MyGov is a small step towards the larger mission of becoming a one stop centre for citizen engagement towards good governance. Over time the number of groups, tasks and discussions will increase. MyGov would also be used as a comprehensive knowledge repository, giving insights from the sharpest and brightest minds across", said the PMO note.

Six additional STPs get government nod ..... Clean Ganga Mission

http://t.co/poW1tMtdkq


6 sewage plants to be set up as first step in Ganga cleaning

Vishwa Mohan,TNN | Jul 25, 2014, 06.20AM IST
Text resize:

NEW DELHI: Kicking off the process to implement its ambitious clean Ganga mission, the Centre has sanctioned six new sewage treatment plants (STPs) for different cities and towns along the river in Uttar Pradesh, Bihar and West Bengal.

These STPs, cleared under the national mission for clean Ganga (NMCG), will come up in Allahabad in Uttar Pradesh; Beur, Karmalichak and Saidpur (Patna) in Bihar and Budge Budge and Barrackpore in West Bengal at an estimated cost of Rs 1058 crore. Thus the environment ministry has set the ball rolling by clearing these six plants\networks which will treat over 113 million litres per day (MLD) of sewage.

There are a number of other plans lined up for Prime Minister Narendra Modi's pet project, which are to be announced in due course after studying the feasibility reports.

"These new plants will add up the capacity to treat sewage in these cities\towns. The Centre will bear 70% of the cost of these new projects," said the environment minister Prakash Javadekar, explaining how the STPs are important to stop filth from going into the river.

Replying to a debate in Lok Sabha on Tuesday, the minister rued the poor functioning of the existing STPs in different states due to shortage of electricity and expressed the need to ensure proper functioning of these plants in future.

"The (existing) STPs do not operate and hence, the filth goes into the river. Water contamination takes place due to this. It can be stopped only if the STPs run 24X7," Javadekar told the Lok Sabha.

Among the newly sanctioned STPs, the Barrackpore plant will have capacity to treat 24 MLD whereas the one at Budge Budge will treat 9.3 MLD of polluted water. Similarly, the plant at Beur and Karmalichak will treat 43 MLD and 37 MLD of sewage, respectively.

Nation-wide, different cities together generate 38,000 MLD of sewage. But, the treatment capacity exists only for about 12,000 MLD of sewage. Magnitude of the problem can be understood from the fact that the Central Pollution Control Board (CPCB) has indentified 144 drains that mostly discharge untreated waste to the tune of 6475 MLD into Ganga alone.

It will, therefore, be a gigantic task to deal with the problem by setting up STPs alone. Strict anti-pollution norms for industries, setting up toilets in huge number in villages\towns\cities along the river and construction of crematoriums are some of the other plans which will take off under the clean Ganga mission in the next couple of months...................http://epaperbeta.timesofindia.com/Article.aspx?eid=31814&articlexml=6-sewage-plants-to-be-set-up-as-25072014011040#

Inter-linking of rivers: Ken - Betwa river link to show the way

http://t.co/t7g06V7vOv


Cabinet okays linking Ken, Betwa rivers

Vishwa Mohan,TNN | Jul 25, 2014, 06.17AM IST
Text resize:

NEW DELHI: The Union Cabinet on Thursday approved the much awaited Ken-Betwa river link which will benefit Uttar Pradesh and Madhya Pradesh in terms of meeting irrigation, drinking water and electricity needs of people across six districts in the two states.

The Cabinet earmarked over Rs 9,000 crore for the project which will transfer surplus water from the Ken river to the Betwa basin through a 221-km canal.

The concrete canal will pass through Jhansi, Banda and Mahoba districts of UP and Chhatarpur, Panna and Tikamgarh districts of MP. The project is likely to be completed in a phased manner by 2019.

The move comes three days after water resources and river development minister Uma Bharati announced the impending decision in Lok Sabha on Monday. She had emphasized that all inter-linking of river projects would be implemented in the next 10 years if the states concerned agreed to it.

Since both the beneficiary states had given their consent for implementing the Ken-Betwa river link under a tripartite memorandum of understanding (MoU) with the Union water resources ministry way back in 2005, the Centre did not find any problem in granting its approval.

The Ken-Betwa link is one of the 30 inter-linking of river (ILR) projects which had got a green signal from the Supreme Court following the tripartite MoU. The apex court had in February 2012 directed the Centre (the then UPA-2 government) to implement ILR in a time-bound manner and appointed a high-powered committee for its planning and implementation.

The ILR plan has been in the pipeline since 1982 when the government set up the National Water Development Agency (NWDA) to carry out water balance and feasibility studies for river linking. It, however, got its first major push under then prime minister Atal Bihari Vajpayee during NDA rule (1999-2004) as a solution to many issues including flood, irrigation and hydro-power.

Though nearly 8,650 hectares of forest land - including part of Panna National Park -- in Madhya Pradesh will be submerged due to implementation of the Ken-Betwa project, the MoU had factored in the issues in view of larger benefit to the water starved region of both states.

The government is now expected to turn its focus towards approving two other ILR projects -- Daman Ganga-Pinjal Link (Gujarat and Maharashtra) and Par-Tapi-Narmada Link (Gujarat) - whose detailed project reports (DPRs) are ready for consideration...................http://epaperbeta.timesofindia.com/Article.aspx?eid=31808&articlexml=Ken-Betwa-river-linking-okayed-25072014015024#

Wednesday, July 23, 2014

Sachin Tendulkar and Rekha give a royal miss to the Rajya Sabha

http://t.co/p2s4N249rc


Celebrity MPs are a rare sight in House

Vishwa Mohan,TNN | Jul 21, 2014, 07.40AM IST
Rekha attended Rajya Sabha on seven days since she was nominated as MP in April 2012.
Text resize:

NEW DELHI: Celebrity MPs simply give a royal miss to Rajya Sabha - the upper House of Parliament - where they find place as 'nominated' members due to their outstanding performance in their respective professions.

Whether legendary singer Lata Mangeshkar (1999-2005) or painter M F Husain (1986-1992) in the past or cricketer Sachin Tendulkar and Bollywood actress Rekha now, the 'nominated' celebrity MP has not matched up to the other nominated members who came from professions like academics, civil services, journalism, legal service or science.

Records show that Tendulkar has attended the House only three times while Rekha attended it on seven days since they were nominated as MPs in April 2012.

Though Tendulkar was expected to attend the House more often once he retired from international cricket, he, surprisingly, attended Rajya Sabha only once after his retirement in November last year. The upper House sat for 35 days during three sessions between December 2013 and July this year, but the legendary cricketer attended it only once.

The attendance record (as on July 17) shows that Rekha attended only seven sitting between May 2012 and July 2014. Neither Rekha nor Tendulkar attended any sitting during the ongoing session of Parliament under the new government.

Their absence from the House is noted by other members. Last week, RJD member and former Union minister Premchand Gupta referred to it while speaking in the House and questioned such nominations.

Besides Rekha and Tendulkar, poet-lyricist Javed Akhtar is the other celebrity among the 12 nominated members in the House. Though Akhtar's record is much better than the other two, he remains a mute spectator during most of the proceedings.

Akhtar, unlike his wife and Bollywood actor Shabana Azmi, has hardly participated in any major debate in the House. He was last heard during a debate on amending the Copyright Bill two years ago. Though he can be seen associating with many members during zero hour, his involvement doesn't match his wife's performance.

Shabana was, in fact, among the most vocal celebrities who raised many issues and actively participated in many debates during her tenure (1997-2003).

Other nominated members, who come from different fields, however, are quite active in the House. Records show that the other nine nominated members - including businesswoman and social activist Anu Aga, veteran journalist HK Dua, theatre personality B Jayashree, eminent jurist K Parasaran and noted lawyer KTS Tulsi - have been quite regular in attending Parliament. Though all of them don't regularly participate in debates/discussions, they can be seen in the House more often.

Article 80 of the Constitution allows the President to nominate 12 members to the upper House. Like other members, 'nominated' members too have a tenure of six years. The government nominates persons having special knowledge or practical experience in matters such as literature, science, art and social service.

Educationist and economist Bhalchandra Mungekar, scientist Ashok S Ganguly and former Union minister Mani Shankar Aiyar are the other nominated members in the present House. Although Mungekar and Aiyar entered the upper House as nominated members, they later accepted Congress membership in Rajya Sabha..................http://epaperbeta.timesofindia.com/Article.aspx?eid=31804&articlexml=Nominated-celebrity-MPs-do-vanishing-act-in-Rajya-21072014011005#

Inter-linking of rivers (ILR) gets fresh push under new government

http://t.co/Crete82JHF


Uma Bharati makes 34,000 MW power point

Vishwa Mohan,TNN | Jul 18, 2014, 10.02AM IST
Text resize:

NEW DELHI: A week after finance minister Arun Jaitley pitched for inter-linking of rivers in his budget presentation, saying the move could yield "rich dividends", water resources minister Uma Bharati on Thursday said rivers across the country could be linked in 10 years time if states agreed. 

The Ken-Betwa river link will be the first to be implemented under the new government as Madhya Pradesh and Uttar Pradesh have given their consent. Two other projects, expected to be implemented on priority, are Daman Ganga-Pinjal link spanning Maharashtra and Gujarat and Par-Tapi-Narmada link in Gujarat.

Replying to a supplementary question in Lok Sabha, Bharati said inter-linking of rivers (ILR) would not only provide electricity to the tune of 34,000 mw but also help in implementation of the ambitious rural irrigation scheme.

Allaying concerns of members, she, insisted that ILR would be taken up only after getting consent of states concerned and it would be implemented in such a way that uninterrupted flow of rivers and their purity would be maintained.

Her remarks assume significance in light of the Narendra Modi government's push for the move. Calling for a serious effort in the direction of river inter-linking, Jaitley's budget set aside Rs 100 crore to expedite preparation of detailed project reports (DPRs).

Presenting his maiden budget on July 10, Jaitley said rivers were the lifeline of the country as they provided water not only for producing food but also for drinking. "Unfortunately, the country is not uniformly blessed with perennial rivers. Therefore, an effort to link the rivers can give rich dividends... It is time that we made a serious effort in this direction," he had said.

Different state governments have objected to four out of 30 ILR projects. While Kerala assembly last year passed a resolution against taking up the Pamba-Achankovil-Vaippar link, Odisha did not agree to the Mahanadi-Godavari link due to submergence of Manibhadra dam/reservoir.

Karnataka objected to the Netravati-Hemavati link, saying it wanted to utilize Netravati water as per its own plan. Madhya Pradesh, which agreed to the Ken-Betwa link, opposed the Parbati-Kalisindh-Chambal link.



Though ILR was mooted way back in 1982, it was seriously taken up only during Atal Bihari Vajpayee's tenure as prime minister during 1999-2004. It, however, fell off the radar once the UPA came to power.

The UPA took it up in its last year in office after the Supreme Court in February 2012 directed the Centre to implement the ILR project in a time-bound manner and appointed a high-powered committee for its planning and implementation.

The full ILR project has two components - the peninsular and the Himalayan. The peninsular component includes diversion of surplus waters of Mahanadi and Godavari to the Pennar, Krishna, Vaigai and Cauvery rivers.

The Himalayan component, on the other hand, was conceived to build storage reservoirs on the Ganga and the Brahmaputra and their main tributaries in India and Nepal in order to conserve water during the monsoon for irrigation and generation of hydro-power, besides checking floods.......................http://epaperbeta.timesofindia.com/Article.aspx?eid=31808&articlexml=Uma-makes-34000MW-power-point-18072014013034# 

Army infrastructure along Indo-China border and roads and powertransmission lines in naxal-affected states to get faster greenclearances

http://t.co/HFJQguLGyr


Faster green nod for Army infrastructure close to China border

Vishwa Mohan,TNN | Jul 16, 2014, 05.41AM IST
Govt has decided to give faster green nod for Army infrastructure close to China border.
Text resize:

NEW DELHI: After giving green approval to all road projects within 100 km of the Line of Actual Control (LAC) along the India-China border, the government has decided to grant similar clearance to other strategic infrastructure including Army stations and ammunition depots in the area. All these projects are crucial for troop movements and related activities near the border.

Environment minister Prakash Javadekar said this on Tuesday while announcing other key decisions of his ministry which will fast-track road construction and laying of electricity lines in Naxal-affected areas.

Many road projects have been pending in 117 Maoist-affected districts due to denial of permission to divert forest land beyond five hectares. State authorities will now be able to divert more forest land for "two lane public roads", irrespective of the area of forest land involved in such projects.

The approval for diversion of forest land for transmission lines will allow power companies to install lines up to the capacity of 1200 KV without getting into the nitty-gritty of the Forest (Conservation) Act. At present, power companies can set up transmission lines only up to 220 KV.

Both decisions will be beneficial for seven Naxal-affected states including Chhattisgarh, Jharkhand, Bihar, Odisha, West Bengal, Maharashtra and Telangana.

Referring to his ministry's earlier decision for border road projects along Indo-China border, Javadekar said, "Grant of similar general approval for diversion of forest land required for setting up of Army stations, ammunition depots, training centers and other support infrastructure within 100 km aerial distance from the LAC is also under consideration."

Such infrastructure also include schools, hospitals and residential quarters for defence personnel.

Though the minister did not disclose details of other projects, he emphasized that the decisions would address "the security and strategic interests of the nation". He also referred to the massive development activities on infrastructural front across the border.

The 'general' approval under the Forest (Conservation) Act, 1980 is a kind of 'advance' approval, allowing the defence ministry to go ahead with such projects without approaching the environment ministry.

"The defence ministry can go ahead after getting basic ground clearance from the respective state governments under the general approval", said an official, adding the move will fast-track those projects along the 4,057 km LAC with China.

China has at least five fully-operational airbases, an extensive rail network and over 58,000-km of roads in the Tibet Autonomous Region, which makes it possible for it to swiftly move over 30 divisions (each with over 15,000 soldiers) to the LAC.

As far as fast-tracking road projects are concerned, the ministry has extended the provision of diversion forest land for construction of all categories of public roads in 117 Maoist-affected districts beyond existing five hectares. The move will allow construction of two lane public roads in these districts, irrespective of the area of forest land involved in such projects.

Coal cess to fuel Ganga rejuvenation plan of Narendra Modi government

http://t.co/QmBpFppquz


Coal cess to fuel Ganga rejuvenation plan

Vishwa Mohan,TNN | Jul 13, 2014, 03.57AM IST
The cleaning of Ganga river will be funded by cess on coal.
Text resize:

NEW DELHI: The Modi government will drive its ambitious Ganga rejuvenation plan with the cess on coal that goes into the National Clean Energy Fund (NCEF).

Since the Fund is originally meant for financing and promoting only clean (renewable) energy initiatives, the government in its 2014-15 budget has proposed to enlarge its ambit and also increased the cess on coal to make the corpus big enough to finance other activities including Ganga cleaning.

Presenting the budget on Thursday, finance minister Arun Jaitley had proposed to increase the clean energy cess from Rs 50 per tonne to Rs 100 per tonne. The cess is presently levied on coal, peat and lignite. The money collected from the cess goes to NCEF which currently has over Rs 3,000 crore in its kitty.

READ ALSO: Tourism to be major part of Ganga rejuvenation plan

Jaitley has also proposed to "expand the scope of purposes of levying the cess to include financing and promoting clean environment initiatives and funding research in the area of clean environment".

Though the finance ministry did not explain what those clean environment initiatives would be, the fine-print of the budget papers clearly bring out that the amount for the national plan to clean\conserve Ganga would be met from the NCEF.

The NCEF money remained largely unutilized during the previous government. Since it currently has over Rs 3,000 crore in its kitty, funding the Ganga cleaning mission will not be a problem.



The government in its budget has set aside Rs 2,037 crore for the 'Integrated Ganga Conservation Mission' called Namami Ganga. Besides, it has also allocated Rs 100 crore for 'Ghat' development and beautification of river front at Kedarnath, Haridwar, Kanpur, Allahabad, Varanasi and Patna.

The finance ministry had also announced to rope in NRIs as important contributors for Prime Minister Narendra Modi's pet project by proposing to set up an NRI fund to finance special projects related to Ganga's rejuvenation.

All these programmes will be implemented by the ministry of water resources, river development and Ganga rejuvenation under Uma Bharti. Earlier such activities were handled by the environment ministry under the 'National River Conservation Plan'.

"For greater efficiency in programme delivery, it has now been shifted to the ministry of water resources," said the budget document...................http://epaperbeta.timesofindia.com/Article.aspx?eid=31808&articlexml=Coal-cess-to-fuel-Ganga-rejuvenation-13072014016026# 

This is what Sunita Narain and R K Pachauri have to say on Union budget2014-15

http://t.co/PlK3kPwV8A


Environmentalists welcome the budget for green initiatives, but rue absence of direction for real change

Vishwa Mohan,TNN | Jul 11, 2014, 10.33PM IST
Text resize:

NEW DELHI: Environmentalists and experts of different policy groups on Friday welcomed the Union Budget as far as certain announcements to care for green cause was concerned, but they said that it lacked the direction for real change at this juncture.

They also appreciated the finance minister Arun Jaitley for setting aside Rs 100 crore for the 'national adaptation fund' on climate change and increasing cess on coal from Rs 50 to Rs 100 per tonne to enlarge the 'National Clean Energy Fund' kitty.

But they, at the same time, pointed out that the finance minister did not spell out what will be done with the money. Huge amount of fund had either been remained unutilized or been spent on many unsuccessful small projects during the previous government and therefore it remained a big concern for environmentalists and green groups.

Sunita Narain, director general of the Centre for Science and Environment (CSE), said, "The recognition that the climate change is real and the need to adapt is urgent is a very important message of the Budget. While it can be argued that this is too little, it is also a fact that this is a first step to recognize the need to invest in building resilience of poor communities against climate change."

But, she questioned the absence of direction in the finance minister's statement. She asked, "What will this money be used for?"

UN's Intergovernmental Panel on Climate Change (IPCC) chairman R K Pachauri too appreciated the move. He, however, said the Rs 100 crore would need to be scaled up in the coming years and various models of co-finance should be explored with varying centre-state contributions.

"A designated ministry for handling of this fund needs to be identified and a process for disbursement for support of adaptation activities should be detailed," said Pachauri, chief executive of the Delhi-based TERI (The Energy and Resources Institute).

Asked about the direction in which the government should move while taking adaptation measures, he said the most critical requirement was to see that we create adequate capacity at every level of the government and every sector of the economy.

"Clearly, the agriculture is perhaps the most important one," said the IPCC chairman. He emphasized on better management of water resources so that it can be available in water scarcity scenario. "Whole management of water cycle has to improve substantially (under the adaptation measures)," he said.

Speaking about enhanced clean energy cess on coal, which is used to capitalize 'National Clean Energy Fund', CSE's chief Narain said, "The finance minister did not spell out what will be done with this money. Currently, roughly Rs 3,000-3,500 crore is collected in the Fund, but not much is spent."

She emphasized that the National Clean Energy Fund is important as it signals the need to make dirty coal more expensive to use.

"It is even more important as it is money that should be invested in renewable energy projects that meet the needs of the poorest. But this is not done. Instead, the money is frittered away in many small projects," she said.

The CSE chief also expressed her concerns over "absence of direction" on the issue of transportation. She said, "Transportation is an important focus area, but the Budget 2014-15 does not provide directions that will work."

"The finance minister sets aside Rs 100 crore for metro projects in Lucknow and Ahmedabad. But the fact is that metro systems cost anywhere between Rs 150 crore to Rs 300 crore per km to build. So, is this Rs 100 crore going to build one km or just go into feasibility studies," she asked.

Referring to the energy sector, TERI in its reaction over the budget appreciated the finance minister's effort to bring solar energy into focus, but questioned its silence over the other clean energy sources.

TERI also strongly welcomed the setting up a National Centre for Himalayan Studies in Uttarakhand.

"The Centre should be multi-disciplinary in nature looking into all aspects of research and implementation linked to the Mountain Ecosystems and people, including glacial, water resources, agriculture, biodiversity and social aspects," it said.

It also said, "Since it is difficult to build institutions which attain high standards and attract high class talent, the proposed Center should function as a networking arrangement to harness the capacity and talents available in existing institutions."